- Strategic Projection
- SISBEN
- File and Correspondence
Source: Development Plan 2008-2011
This strategic area linking three areas:
- Housing Infrastructure and equipment
- Utilities
Source: Development Plan 2008-2011
This strategic area linking three areas:
Source: Development Plan 2008-2011
This strategic area linking three areas:
NOTE: Any plan should be signed by an Architect and Civil Engineer and owner, also attach photocopy of Professional Registration.
NOTE: Any plan should be signed by an Architect and Civil Engineer and owner, also attach photocopy of Professional Registration.
Adequacy existing Ramp & Deck:
corresponds to the area behind the current location of the kiosk, which will become a treatment of flat concrete. This area should be left free so that there are developed cultural or recreational activities.
Shaping new Terrace :
The area occupied by the kiosk will be extended forming a reinforced floor terrace and a protective structure. Have a surface finish on clay pavers to and glazed board kiosk area.
Adequacy existing Ramp & Deck:
corresponds to the area behind the current location of the kiosk, which will become a treatment of flat concrete. This area should be left free so that there are developed cultural or recreational activities.
Shaping new Terrace :
The area occupied by the kiosk will be extended forming a reinforced floor terrace and a protective structure. Have a surface finish on clay pavers to and glazed board kiosk area.