The work consists in the adaptation of an area on the banks of the Magdalena River in the urban sector of the town of Flanders in the Tolima Department, through the construction of a pier is a pier, the main work to be performed:
existing Kiosk Relocation:
sector where the Kiosk is currently be extended to the river through the formation of a terrace on which the kiosk will be located again, but closer to shore. This activity involves the disarmament and subsequent assembly of structural elements to maintain the same provision.
existing Kiosk Relocation:
sector where the Kiosk is currently be extended to the river through the formation of a terrace on which the kiosk will be located again, but closer to shore. This activity involves the disarmament and subsequent assembly of structural elements to maintain the same provision.
Adequacy existing Ramp & Deck:
corresponds to the area behind the current location of the kiosk, which will become a treatment of flat concrete. This area should be left free so that there are developed cultural or recreational activities.
Shaping new Terrace :
The area occupied by the kiosk will be extended forming a reinforced floor terrace and a protective structure. Have a surface finish on clay pavers to and glazed board kiosk area.
Grandstands Construction:
will be located against the lower wall that forms the existing terrace. It will be a masonry structure, confining the existing landfill which is stabilized by a reinforced concrete wall built in the foot of the slope.
Dock Construction and Ramp:
dock structure consists of a reinforced concrete structure, founded on piles preexcavados and consists of two rows of stairs to and a ramp, comprising an edge length of 15 meters, enough to accommodate the existing vessels , before a possible tourist development, a larger boat.
will be located against the lower wall that forms the existing terrace. It will be a masonry structure, confining the existing landfill which is stabilized by a reinforced concrete wall built in the foot of the slope.
Dock Construction and Ramp:
dock structure consists of a reinforced concrete structure, founded on piles preexcavados and consists of two rows of stairs to and a ramp, comprising an edge length of 15 meters, enough to accommodate the existing vessels , before a possible tourist development, a larger boat.
containment structures Gabions:
are located at the base of the slopes above the main deck to and consist of elements with a diameter of 1.00 X 0.50 M. crawler built in triple twist mesh.
are located at the base of the slopes above the main deck to and consist of elements with a diameter of 1.00 X 0.50 M. crawler built in triple twist mesh.
Access Viewpoints:
cross the ladder will be removed giving access to the lower viewpoint and replaced by a longitudinally placed wider than communicate with the new terrace.
cross the ladder will be removed giving access to the lower viewpoint and replaced by a longitudinally placed wider than communicate with the new terrace.
Drainage System:
It will form a transmission line to collect the sewage currently discharged on the slope and those that come from the kiosk. Stormwater will be handled at the level of the surface, part will be conducted to the existing channel, which runs through the river through a pipeline of 36 "and another will spring into the structure through which poured directly into the stream.
The existing wall that delimits the area project by the most high, has cracks, for that reason, we will seek to relieve the hydrostatic pressure on this conditioner a horizontal drains. The area where the bleachers will be built will be equipped with a horizontal drainage system to improve its stabilization.
Lighting: Install the fixture
enough artificial light to give the whole sector.
enough artificial light to give the whole sector.