With resources allocated by the Colombian Family Welfare Institute, began the bidding process and selected the contractor, proceeded with the demolition of the structures of old municipal slaughterhouse, the municipality provided land for the construction of " Home clustered early childhood. "
Recruitment for home building clustered formalized through contract No 143 of 2009 for the sum of one hundred thirty-eight million dollars (138 million U.S. dollars). The construction process of six steps:
- Demolition
-
Stake Excavations of footings -
-
- shoe covers foundation beams Tie Die Cast
- foundation beams
- Cast
floor plate - MasposterÃa
-
- drain pipe installation and electrical points
- metalwork design modification
- air cast beams
- Panet
-
- cover installation finishes
- doors and windows and granite tablet installations (washing yard)